View All Projects
Biomass Verified Demonstration

UTAR Biomass Gasification Demonstration System

Universiti Tunku Abdul Rahman (UTAR)

Project Overview

A verified WTP-X gasification demonstration system operating under the UTAR research collaboration, confirming 100 kW electrical output from 150 kg/h feedstock throughput. This is the base system validated to date — do not extrapolate larger system performance without engineering confirmation.

The Challenge

Before wider deployment, WTP-X gasification performance on tropical biomass feedstocks needed to be confirmed under controlled, monitored operating conditions rather than assumed from vendor datasheets alone.

Our Solution

A WTP-X gasification unit was installed and operated at UTAR under the research collaboration, processing feedstock at up to 150 kg/h (moisture below 20%) to confirm a verified 100 kW electrical output, equivalent to up to 3.6 tonnes/day under continuous operation.

Results & Impact

  • Verified electrical output: 100 kW
  • Verified feedstock throughput: 150 kg/h
  • Equivalent capacity: up to 3.6 tonnes/day under continuous operation
  • Feedstock moisture requirement confirmed below 20%
  • Operated under active UTAR research collaboration

Project Details

Client
Universiti Tunku Abdul Rahman (UTAR)
Location
Kampar Campus, Perak, Malaysia
Year
2024
System Capacity
100 kW · 150 kg/h feedstock throughput

Interested in a Similar Project?

Contact us to discuss how we can deliver results for you.

Get in Touch