Project Overview

A detailed technical and financial feasibility study for an integrated waste-to-energy system at Irufushi Beach & Spa Resort — assessing daily waste volumes, combustible waste composition, energy demand profiles, and the economic case for a combined gasification-fermentation-upcycling facility.

The Challenge

Irufushi currently transports all solid waste by boat to Noonu Atoll's regional waste management facility — a costly, weather-dependent, and carbon-intensive operation. The resort's sustainability commitments require a credible pathway to on-island waste independence.

Our Solution

OneTouch Group conducted a six-week on-site waste characterisation study, energy audit, and site assessment. A phased implementation plan was developed: Phase 1 (kitchen waste fermentation + can upcycling), Phase 2 (gasification power), with financial modelling showing 4.2-year payback at current diesel prices.

Results & Impact

  • Waste characterisation: 6.8 t/day total, 2.4 t/day combustible fraction
  • Recommended system: 100 kW gasification + 5 t/day fermentation unit
  • Projected diesel displacement: 85% of current consumption
  • Financial model: 4.2-year payback, MYR 1.2M annual savings
  • Phase 1 procurement decision pending resort board approval
  • Environmental impact assessment completed and submitted

Project Details

Client
Irufushi Beach & Spa Resort, Maldives
Location
Noonu Atoll, Maldives
Year
2025
System Capacity
Feasibility Study

Interested in a Similar Project?

Contact us to discuss how we can deliver results for you.

Get in Touch